Case Studies

PERTAMINA REVITALIZATION PROJECT OF RCC BALONGAN REFINERY
Location: Indonesia Using the LR rigging system and tail frame, the reactor was turned into horizontal before being transported. Scope of Work description: Pertamina and

BRIDGE GIRDER INSTALLATION ENGINEERING
Location: Gary, Indiana Key achievements: Prepare engineering documents for theinstallation of two girder pairs under an activetoll way and over a river. Coordinate with all

FCU TURNAROUND—D-80 THIRD STAGE SEPARATOR
Location: Whiting, USA Key achievements during critical lift verification: Reviewed all heavy lift plans from transport at fabricator to installed at the Refinery, a 6

Modularization – Optimize or Maximize?
Construction of a nickel mine and processing plant in New Caledonia did not progress effectively using traditional construction techniques, and the Owner sought alternatives. Lowther-Rolton

LOWTHER-ROLTON ENGINEERING FOR TRANSPORT OPERATIONS
Lowther-Rolton assisted our Client prepare for a complex five-day move of this 850 ton Condensation Tower over a 50km route. The move was particularly challenging

PLANNED ENGINEERED LIFTS USING OVERHEAD CRANES
Lowther-Rolton regularly assists our clients when they need to make an engineered lift plan. This means making a lift where the lift is in excess