Case Studies

BP Whiting Modernization Project 2009-2014 (VIDEO)
Contracted to BP as independent 3rd party Technical Auditors and advisors for all transportation and heavy lifting proposals together with the associated engineering aspects, including

BP Castellon Refinery – Revamp Project Vacuum Column Installation 2016-2018 (VIDEO)
A Peer Review Report was commissioned by BP Oil España (BP) and prepared by Lowther-Rolton to assess the Heavy Lift and Transportation (HLT) planning issued

Rumaila Field Iraq 2014-2019 Heavy Equipment Transport
Lowther-Rolton played a critical role in adapting the Vessel design to accommodate load movement and installation equipment and to reshape the installation methods during the