Projects – Construction Planning
Projects > Construction Planning

Birmingham Convention Centre Project - Birmingham, UK

  • REDPATH DORMAN LONG/CLEVELAND BRIDGE
    Client: Redpath Dorman Long (RDL)/Cleveland Bridge

    Construction engineers, engineering advice and management for constructing the Birmingham Convention Centre roof.

Blacktip WHP Loadout Project - Henderson, WA, Australia

  • ENI-SAIPEM/TUTT BRYANT
    Client: Eni-Saipem/Tutt Bryant Project Services

    Load movement engineering for the 1,203Te and 585Te Platform Jacket and Topside.

Bridge and Monorail Construction Projects - UK and Dominican Republic

  • FAIRFIELD MABEY
    Client: Fairfield Mabey Ltd

    Operational attendance, engineering advice and management for various bridge erection projects.

Building Erection Projects - London, UK

  • REDPATH DORMAN LONG/CLEVELAND BRIDGE
    Client: Redpath Dorman Long (RDL)/Cleveland Bridge

    Construction engineers, engineering advice and management for various building erection projects through London including Canary Wharf DF-7/FC-4, Cannon Street Station, Earls Court Station, Embankment Place, Victoria Station and News International Buildings.

CCRU Project - Tarragona, Spain

  • TECHNIP BENELUX
    Client: Technip Benelux

    Technical assistance, operational attendance, surveying and management for the construction and load movement of CCRU Modules from assembly to installed position.

Clark Refinery Project - Port Arthur, Texas, USA

  • FOSTER WHEELER
    Client: Foster Wheeler Construction Inc

    Site attendance, engineering advice and management of installation projects for Foster Wheeler in Port Arthur, Texas.

CWHE Replacement Project - Algeria

  • LINDE AG
    Client: Linde AG Engineering Division

    Preparation of conceptual lifting studies for the replacement of a 127Te Main Cryogenic Heat Exchanger.

Docking of ANZAC Class Frigate Project - Henderson, WA, Australia

  • AMC/TUTT BRYANT
    Client: AMC/Tutt Bryant Project Services

    Docking and transportation of a 3,500Te Naval Frigate.

Docking of Volxox Anglia Dredging Barge - Henderson, WA, Australia

  • AMC/TUTT BRYANT
    Client: AMC/Tutt Bryant Project Services

    Preparation of engineering calculations and detailed drawings for the docking transfer of the 1,540Te dredging barge and support cradles from the floating dock utilizing 129 of SPMT axles.

Enhanced Gas Separation Project - Kinneil, UK

  • BP EXPLORATION
    Client: BP Exploration Operating Company Ltd

    Appointed by BP to complete a route survey and feasibility study for the offloading of process Modules (PAUs) up to 460Te, from flat topped barge at Forth Ports facility with subsequent transportation and installation at the project location by self-propelled modular transporters (SPMT).

Exxon Singapore Aromatics Project - Singapore

  • FOSTER WHEELER
    Client: Foster Wheeler Eastern Pte

    Appointment to Foster Wheeler Eastern for provision of transportation and heavy lift engineer and co-ordinator during the construction phase for installation of approximately 200 Modules.

FCC Stages 1 and 2 Projects - Grangemouth Refinery, UK

  • BP OIL
    Client: BP Oil Grangemouth Refinery Ltd

    Construction engineers appointed for construction concept, tender, engineering, Technical Auditing and operational attendance during all transportation and lifting operations, on behalf of BP.

FCCU Revamp Project - Clyde Refinery, Sydney, NSW, Australia

  • SHELL REFINING
    Client: Shell Australia

    Construction engineers for the removal/replacement of process equipment during the FCCU Revamp. Involvement from concept stage for the proposed removal through detailed engineering to operational attendance as heavy lift engineer for the project task team.

HDS-2 Revamp Project - Lindsey Oil Refinery, North Killingholme, UK

  • TOTALFINAELF
    Client: TotalFinaElf

    Technical assistance from tender stage for transportation and lifting of 380Te Reactor into live plant.

Heat Exchanger Replacement, Flare Derrick and Reactor Installation Projects - Merak, Indonesia

  • PT PENI
    Client: PT Petrokimia Nusantara Interindo.

    Operational attendance for erection of a sub- assembled Flare stack derrick, 120m high.

    Independent technical check, safety audit, including site attendance, for the installation of a Reactor comprising two sections, the top weighing 190Te. The lift utilised a Manitowoc M4600 Ringer crane mounted on a piled foundation. The Technical Audit considered the Reactor, lifting equipment and geo-technical analysis of imposed ground loadings.

Hot Briquetted Iron Project - Port Hedland, WA, Australia

  • BHP
    Client: BHP-Direct Reduced Iron Pty Ltd

    Construction engineers for the HBI Project which involved the modular construction of the 2 major structures up to 100m high structures included 15,000Te of structural steel, 24 heavy process equipment items, numerous heavy presses and rotating equipment together with a Gas Generation Plant which comprised 27 Modules, up to 480Te each, 6 major Columns, further Vessels and a 100m high common Flue Stack.

Hot Briquetted Iron Project - Puerto Ordaz, Venezuela

  • ORINOCO IRON
    Client: Orinoco Iron CA

    Construction engineers for the HBI Project, similar to that in Australia.

INCO Nickel Project - New Caledonia

  • HATCH
    Client: Bechtel/Technip/Hatch JV

    Technical assistance and planning during the Bankable Feasibility study for modular construction of Nickel Processing Plant for INCO. Technical assistance to the JV for load movement operations covering sea and land transportation of pre-defined Modules.

Isomerisation Unit, 92 and 94 Turnaround Projects - Coryton Refinery, UK

  • MOBIL OIL
    Client: Mobil Oil Co Ltd

    Operational supervision, on behalf of Mobil, of all craneage operations. Comprising numerous lifts and utilising up to 43 cranes on site at one time. Operational attendance for the transportation and installation of 11 PAUs, 7 PARs and 8 Columns.

KG Flex Project - Grangemouth

  • INEOS
    Client: INEOS Manufacturing Scotland Ltd

    Preparation of a feasibility study to determine the craneage and transportation requirements for the delivery and installation of 4 Columns, 7 PAUs and other process equipment items, up to 214Te each, into the live plant, surrounded by 3 Flare lines and a Heater bank.

LPG Storage Upgrade, TAR94, TAR98, TAR08 and TAR12 Projects - Kwinana Refinery, WA, Australia

  • BP OIL
    Client: BP Kwinana Refinery Pty Ltd

    Operational attendance for Turnaround, including installation of a 230Te Fractionation Column pre-turnaround. Detailed design of lifting scheme for decommissioning of existing Columns and Fractionator.

Mogas Project - Kwinana Refinery, WA, Australia

  • DAVY JOHN BROWN
    Client: Davy John Brown Pty Ltd

    Operational attendance, engineering advice and management for installation of Vessels up to 165Te.

Nippon Express, Seraya 2 Project - Singapore

  • NIPPON EXPRESS PTE
    Client: Nippon Express (Singapore) Pte

    Operational attendance, engineering advice and management for installation of Vessels.

Olefins III Plant - Al-Jabail, Saudi Arabia

  • ARABIAN PETROCHEMICAL COMPANY
    Client: Kinetics Technology International BV

    Detailed structural analysis of 4 No 2,500Te Furnace Modules, to conceive a land transportation scheme by SPMT incorporating a hydraulic load balancing system between each Module and the SPMT, to evenly distribute the Module’s self weight over its 44 support points, with minimal strengthening steelwork.

RCCU Project - Stanlow Refinery, UK

  • FOSTER WHEELER
    Client: Foster Wheeler Energy Ltd

    Operational attendance, engineering advice and management for installation of Reactor, Regenerator, and Fractionator weighing up to 670Te

RCCU Shutdown Projects - Geelong Refinery, Vic, Australia

  • SHELL REFINING
    Client: Shell Australia

    Construction engineers for the removal/replacement of process equipment during various RCCU and Unit Shutdowns since 1999. Involvement from concept stage for the proposed removal through detailed engineering to operational attendance as heavy lift engineer for the project task team.

SECCO Project - Shanghai, China

  • BP CHEMICALS
    Client: BP Chemicals China

    Technical assistance for a load-in facility to deliver process equipment items for new refining facility.

Unit 31 Turnaround Project - Antwerpen Refinery, Belgium

  • TOTALFINAELF
    Client: TotalFinaElf

    Technical assistance from tender to completion for transportation and lifting of process equipment Columns and Modules during the Alkylation Turnaround.

Utah Point Berth Project - Henderson, WA, Australia

  • AMC/TUTT BRYANT
    Client: AMC/Tutt Bryant Project Services

    Preparation of engineering calculations and detailed drawings for the transportation of 56m high Shiploader using 36 axle lines of SPMTs with a total payload of 648Te.

Our Work Gallery