
Emergent Generator Lifts
During the 2017 Spring Outage season, Lowther-Rolton was commissioned by our Client, a major field services organization in the power sector, to undertake a Technical

During the 2017 Spring Outage season, Lowther-Rolton was commissioned by our Client, a major field services organization in the power sector, to undertake a Technical

Lowther-Rolton were appointed by our Client to undertake a feasibility study to determine the craneage and transportation requirements for the delivery and installation of process

Lowther-Rolton have been appointed by a major international Client in the power sector to engineer conceptual lift studies for the removal and re-installation of Gas

The service Lowther-Rolton provides can be adopted at any stage of a project from FEED through engineering development to construction, however, an early appointment would