Blog
Home >  Blog
Thumb
Lowther-Rolton undertake feasibility study to determine the craneage and transportation requirements 18 September 2015

Lowther-Rolton were appointed by our Client to undertake a feasibility study to determine the craneage and transportation requirements for the delivery and installation of process Columns, PAUs and other process equipment items, into the live plant, as part of their Project. Engaging Lowther-Rolton at an early stage of the Project enabled the Client to consider various transport and installation options and their potential effect...

Thumb
Lowther-Rolton appointed by a major international Client to engineer lift studies for the removal and re-installation of Gas Turbine Rotors 15 July 2015

Lowther-Rolton have been appointed by a major international Client in the power sector to engineer conceptual lift studies for the removal and re-installation of Gas Turbine Rotors at a multiple unit power generating plant, as part of the planned Spring 2016 outage. With restricted access and limiting ground conditions at the facility, LR’s concept lifting proposals are required to...

Thumb
The service Lowther-Rolton provides can be adopted at any stage of a project from FEED through engineering development to construction 12 April 2015

The service Lowther-Rolton provides can be adopted at any stage of a project from FEED through engineering development to construction however, an early appointment would benefit the project and assist our Client to achieve their objective of completion safely to budget and schedule. Our team of engineers design practical solutions and construction techniques based on Lowther-Roltons considerable...

Our Work Gallery