Independent consultancy service
for the planning, design, auditing and site management

Client:  Ting Kau Contractors Joint Venture.

Conceptual and detailed design of self launching gantries for the erection of steel deck frames weighing up to 90Te and the placing of 12Te pre-cast deck slab units on the erected deck frames, for this 1177m long, 4 span, twin deck cable stayed bridge.